Benchmark Service: Construction Phase Services
Issue: During a project, an issue arose where the crew prioritized completing a high volume of roofing squares in a single day over conducting thorough inspections of the underlying substrate. Specifically, the wood decking was not consistently checked for structural integrity before proceeding with the roofing installation process. This oversight resulted in instances where crews laid down gypsum board over compromised wooden joists and proceeded to attach the roofing membrane. Such a rushed approach jeopardized the overall stability of the roof and posed significant risks.
Solution:
To mitigate this issue, a structured inspection process was implemented as part of the Benchmark morning routine. Each day, suspect areas in the substrate were carefully identified and assessed. Inspectors physically tested the wood decking by applying pressure and evaluating the amount of “give” in the structure. If the substrate exhibited more flexibility than normal, it signaled the possibility of a broken joist beneath the surface.
Once these compromised areas were identified, the process of repair began. The existing decking in the affected zone was carefully removed to expose the damaged joists. Damaged joists were taken out and replaced with structurally sound materials, ensuring the integrity of the substrate. After the joists were replaced, new decking was installed. Finally, the layers of the roofing system—including the gypsum board and roofing membrane—were reapplied over the repaired area.
This inspection and repair practice became a routine occurrence on this specific project due to the frequency of broken joists discovered during the inspections. However, these proactive efforts were vital in ensuring a high-quality and dependable roofing system for the client.
Possible Impact: Failing to address the issue of broken wooden joists could have resulted in significant structural vulnerabilities for the client’s new roofing system. Two major risks were identified:
Through timely identification and correction, the risk of system failure was neutralized. The collaborative efforts contributed to a secure, reliable, and long-lasting solution for the client’s asset. This adherence to quality ensured peace of mind for the client and exemplified Benchmark’s reputation for expertise and reliability.
The damaged wooden joists were identified, removed and replaced, and new decking was installed. |